Building Design Process Essay

Any edifice, whether it is a high-rise skyscraper or minute cabin must hold a design program before it is constructed, without a design program the builders building the edifice would be limited in cognizing what it is they are traveling to construct unless for illustration it was authorities funded for an establishment like the NHS, this would propose it is to make with health care such as a infirmary or attention place.

Buildings can hold really complex designs so a structured process for the design squad to work from is indispensable to success, for a successful and high public presentation constructing it must be aesthetically delighting, operational, productive, sustainable, easy accessible, cost-efficient, secure and safe to be in. The chief factors that influence the design procedure are ; finance, the client ‘s needs the design, timing and estimated bringing of the undertaking.The Architect that is planing the new mill unit must take into the history the fiscal bounds that the client has and plan the mill unit consequently doing certain it can be achieved realistically on the budget provided. The designer tasked with planing the mill unit is able to measure whether the physique is realistic on the financess available by comparing the design to old physiques they have designed in the yesteryear or by ciphering edifice costs per m^2 and volume per unit. It is of import that the Architect ensures the physique is executable so the budget of the client is non exceeded although 10-15 % of undertakings costs are paid in fees the Architect must still do the undertaking cost effectual for the client.In the design procedure one of the most of import factors is the site that the undertaking intends to be built on and the surrounding environment ( for environmental concerns ) as there could be hidden menaces to whether the undertaking can travel in front or non refering the foundations of the land or the location itself.

We Will Write a Custom Essay about Building Design Process Essay
For You For Only $13.90/page!


order now

Obtaining be aftering blessing from the local council is the first phase after geting the land to construct on so the undertaking can come on. Having a Site Investigation study undertaken of the land proposed to construct on will give an analysis of the undersoil composing, bearing values ( maximal force per unit area on foundation dirt that provides equal safety against rupture of dirt mass ) , hazard of taint and the presence of H2O that could do harm under the edifice such as belowground watercourse and rivers. Understanding the topography of the land to find whether it is inclining, the existent size, form and understanding the wave are of import to cognize before edifice because they could present serious menaces and alterations to the original design. Desk top surveies can be obtained to demo the land history on munition study plans dating back to the 1800s and the NCB ( National Coal Board ) can be contacted for excavation records of the land. The Architect could besides look on the Flood Risk Environment Agency ‘s web site and utilize the ZIP code of the land to see whether the country is prone to deluging, old Ordnance Survey plans and drawings are other methods the Architect could utilize to understand the country better.There would be no point in constructing the new mill unless the Client ‘s demands were non traveling to be met so it is indispensable for the Architect and the design squad to present for the client precisely what they are paying them for. As the edifice is a mill unit it will most probably be being built for industrial usage therefore demands such as parking infinites must be made comparative to the needed sum. The Client may besides desire their new mill unit to be sustainable and want to cut down the sum of pollution created in the edifice procedure so that should seek to be kept to a lower limit by the workers.

Particular demands may be needed by the client such as maps suites for meeting, public assistance installations and a canteen for employees working at the new mill unit.The Design of the new mill unit must be structurally stable and have fire unity with stuffs suitably selected significance it is equipped with fire combat and forestalling equipment such as fire asphyxiators and fire doors which can keep back a fire for up to half an hr. As portion of achieving be aftering permission for the physique the council must hold that it blends in with the environing constructions which is usual dependant on whether the edifice is of a similar size, graduated table and tallness to others nearby whilst complementing the streetscape.Environmental impact can be estimated after taking an E.I.A. ( Environmental Investigation Agency ) appraisal which determines the impact on the local and natural environment of edifice work taking topographic point, biodiversity issues such as vegetations and zoologies ( animate beings in a specific part or country ) can besides be addressed after the appraisal.It is likely that the Client will desire the new mill unit completed every bit shortly as possible nevertheless this creates force per unit area on the design stage so an understanding must be came to as to when the undertaking can realistically be completed after all initial issues in the design procedure have been addressed so the edifice is near perfect.

A deficiency of planning in the design stage as a consequence of hastiness from the client means an unrealistic timescale is created and the edifice fails to present along with the failure for the work burden to be scheduled efficaciously. It can take up to three months for the design and blessing to be made along with another month for stamps to be submitted ( contractors estimations of costs ) , depending on the graduated table and complexness of the design it can take anything from 6-24 months for the physique to be completed.

P2 ) Explain the functions and duties of the design squad

In a typical design squad the Architect is the chief leader and is polar to the success of the undertaking, the other members of the design squad include the Client, Interior Designer, Landscape designer, Building services applied scientist, Clerk of plants, Structural Engineer, Resident applied scientist, Quantity surveyor and the chief contractor paid to transport out the work. In a design squad, communicating is paramount to holding a successful undertaking which is why all members should be crystalline with the exchange of information pulling in the right way at the same clip to guarantee the undertaking work is carried out every bit intended to understate errors.An Architect ‘s duty in the design squad is chiefly to fulfill and understand the Client whilst pass oning efficaciously with the remainder of the squad so that the undertaking will be completed in a suited timescale and cost effectual to the client.

The Architect is paid to understand the client ‘s brief and develop a program on how to run into the demands of the client whilst keeping the new development is sustainable for the good of the environment. It is of import for the Architect to bring forth a design that can realistically be constructed which does non conflict anyone ‘s wellness and safety. An apprehension of Health and Safety statute law such as the Health and Safety at Work Act 1974 is indispensable so there is a bar of accidents in the workplace. They are responsible for the direction of the design procedure and choice specializers in their specific countries ; the designers must organize the input from the design squad and guarantee it works together.A Civil Engineer ‘s function in the design squad is concerned with what is go oning below the land, the foundations and the concluding touches.

How these factors can impact the new mill unit that is being built there is determined by the Civil Engineer who will hold a good apprehension of them. It is the Civil Engineer ‘s duty to set about the Site Investigation study which so allows them to analyze the bomber dirt complexness in bend finding what foundations and infrastructures are needed for that peculiar country before edifice work begins. The basis construction is approved by the Civil Engineer so it is suited for the new mill unit alongside including necessities for the employees that will utilize the edifice such as roads, pathwaies, parking infinites, under base on ballss, tunnels and Bridgess for easiness of entree to the unit. Drainage below the land of the new unit is besides accounted for by the Civil Engineer with traffic direction taken attention of after a main roads and transits appraisal of the environing country is undertaken.The CDM Co-ordinator is responsible for the design and building safety issues associated with the mill unit, they have a deep apprehension of the relevant Health and Safety statute law related to the undertaking which helps them fix and keep a CDM file of all the Health and Safety incidents including accidents. An F10 signifier is produced which informs Health and Safety Executive that there is a new undertaking traveling in front, Health and Safety so have the right to turn up and see a site, they can so rede as to what needs to be changed to increase safety, the Health and Safety inspectors besides have the authorization to manus out mulcts consequently.Measure surveyors are assigned their function by the Architect and are efficaciously comptrollers for the edifice work ; it is their duty to gauge how much the stuffs needed for the edifice work to travel in front are traveling to be the client. The Quantity surveyor can rede the Architect and the client on the cost of the occupation and re-evaluate the cost during the undertaking in instance it does non all go to program.

The Q.S. can assist the client to maintain within their budget possibly by utilizing cheaper stuffs opposed to the intended 1s used in the initial design. A Bill of Measures ( BOQ ) is prepared which is a papers consisting of a list of stuffs needed for the building work and their estimated measures ( costs ) .

The Contractor stamps against the Bill of Measures prepared by the tenderer giving their monetary values for what is listed, the offers are compared in order to see whether they are good or hapless value and the eventual stamps are negotiated for the best solution.The Structural Engineer is tasked with doing certain the edifice is structurally sound and safe for the dwellers, safety is overriding to the Structural Engineer because if the construction of the new mill unit is non designed to defy the forces that will be imposed on the mill it could turn out black for people working inside who are at a heightened hazard of hurt. It is indispensable for the Structural Engineer to do best usage of the financess that are available to them in doing the new mill unit cost effectual ; they must supply the right stuffs that complement the design specification such as the right bricks, concrete and wood. Structural Engineers are employed by the contractor depending on the contract of the occupation and can work closely with the Civil Engineer to understand the feasibleness of the edifice.( P3 ) The production squad working on the proposed new mill unit will include the Main Contractor, Managing Director ( MD ) of the Main Contractor ; the Managing Director is accountable for Head Office Admin, Contract Managers and the outside contractors and advisers. The Site director is accountable to the contract directors but is accountable for the site forces, sub contractors, trades chiefs and the ganger.Site forces such as the applied scientists are responsible for the planning and agendas of the undertaking such as projecting when concrete pours will take topographic point, they are normally housed in on site cabins with internet entree for easiness of communicating with other members of the building squad.

Alongside their planning responsibilities, applied scientists are frequently turned to when a job arises and are expected to decide that job every bit fast as possible in order to maintain the undertaking on-track for completion.Site disposal doing certain all necessary paperwork is completed and the security squad are at that place to discourage people intruding or hooking from the site. Sub Contractors include pipe fitters, linemans, roofers, scaffolders, glazed glass fitters, cladders, route beds and sewerage contractors. Trades chiefs are in charge of bricklayers, joiners, plasterers and painters. Gangers are made up by the general laborers, concreters, drain beds and works drivers ( JCB diggers, excavators, dump trucks and rollers ) .

P4 ) Describe the legal deductions that may originate from hapless or miscommunications impacting the undertaking

In the Production Team it is really of import that the members communicate so that statute law is obeyed and work is non completed falsely which provokes claims and slows advancement in the physique. As a consequence of miscommunication claims for misinformation or transporting out stillborn work can be made if you can warrant the extent and footing of grounds why, these could be for illustration, twenty-four hours to twenty-four hours mistakes that are exposed which can now be rectified and clarified with instructions or fluctuations orders.

More serious breaches of carelessness or neglecting to carry through contracted duties are a ‘tort ‘ in jurisprudence and will ensue in legal actions. Most professional people have insurance against design hazard and sometimes losingss are recovered from insurance companies. Any client come ining into a contract state of affairs with builders must guarantee insurance for loss is covered besides ; the builder has public liability insurances alongside insurance for their employees and for the plants.

M1 ) Explain how the RIBA program of work provides an effectual and structured model for the design procedure in complex undertakings and how it is sometimes modified or non purely followed

The RIBA ( Royal Institute of British Architects ) program of work 2013 provides a structured model for the design procedure of new edifices ; it provides both the phases for the design and building stages of undertakings. Although Architects will hold the necessary makings that indicate to clients and their employers that they are competent plenty to head the design squad and work on a undertaking, the RIBA program of work provides counsel for all the stages of the undertaking including the design and building. With a structured program everyone involved in the undertaking knows there function and can go on with it whilst the remainder of the undertaking continues to come on, the Architect will keep full control of the program but has a better apprehension of who is making what and what is being done at what clip.

The first subdivision covers stages A + B which consist of the Appraisal and Design Brief. Client ‘s demands + demands are taken into history alongside the budget, purpose group of the edifice, Numberss of people utilizing the edifice, suiting visitants, parking, site entree, land suitableness, site probe studies, form and whether there is a slope/undulation.Stage C is the Concept. Design proposals and constructs must be agreed before any building work can travel in front and drawings are sketched on feasibleness options.Stages D + E are the design development and proficient design, concluding design proposals are developed and confirmed after audience of old proposals. The client has options now that they can see all of the elaborate designs and are so able to make up one’s mind on a concluding design which leads us on to the pre-construction stage of the RIBA program of work.Phases F, G & A ; H being the production information, stamp certification and stamp action ; a design squad is put together to bring forth certification drawings and specifications ready for stamp action.

In phase F production information must be prepared and concluding determinations related to the design work can be made. Drawings, agendas and specifications are finalised after taking all of the new designs into history which are so sent to the Architects, applied scientists and Main Contractor who are straight involved. Stage G involves the Bill of Quantities and stamp paperss production under the NJCC ( National Joint Consultative Committee ) process for selective tendering outlined in phase HPhases I, J & A ; K revolve around mobilization puting the contract for production of the edifice.Phase L is the concluding measure of the RIBA program of work and is merely the station building stage of the undertaking where it is completed and handed over to the Client for usage.The RIBA program of work is particularly of import for Architects when they are tasked with planing a edifice that will hold a really complex construction ; it is comprised into three subdivisions incorporating the feasibleness stage, the pre-construction stage and the building stage. It is non merely the Architect that must cognize the phases of the program because when alterations need to be made and accommodated, the other key participants in the squad demand to be made cognizant of the developments of the design as it continues. If the key participants are non pass oning and make non to the full understand the alterations being made or how they will impact the construction it can be really damaging to success.In the feasibleness phase the Architect will work with the client in order to understand the demands of the edifice and to urge anything that can better the edifice as a whole.

It must integrate ‘buildability ‘ which is a term used to depict whether a edifice can be constructed easy or non and must be financially executable. In the pre-construction stage the Architect can bring forth studies of the layout, design and building in order for the client to O.K.

what the Architect has designed. Drawings to be submitted to the local authorization edifice control will besides be drawn and when the lineation is approved concluding determinations can be made associating to the design, specification and building. If alterations need to be made they can still be accommodated at this early phase but will incur extra costs, these alterations must be noted so that everyone can be informed of them therefore they are drawing in the right way. The program may non ever be purely followed when there is a deadline that needs to be met and finishing a peculiar phase may be ignored when it is non seen to be necessary to salvage clip.